Our current test-program includes 500-hours of operational testing. We typically perform 24-hour test runs to evaluate process conditions. In this case, we are processing a waste biomass feed, which is converted (using thermal reforming methods) into clean syngas gas. We are looking into the flare during operation, while research team members are monitoring the system parameters.